Guidance

Employer's requirements part B: FE generic design brief

Further education generic design brief and technical annexes.

Applies to England

Documents

Details

The generic design brief sets out the technical requirements for college construction projects capturing context, key principles and requirements for:

  • buildings and grounds
  • fittings, furniture and equipment
  • ICT
  • operational and maintenance matters

This documentation should be read in conjunction with:

These documents form the employer鈥檚 requirements for the DfE construction framework and the offsite schools framework: modern methods of construction (MMC1). Part B and part C include the further education output specification.

For use by:

  • contractors
  • technical professionals
  • suppliers
  • colleges
  • academies
  • local authorities
  • dioceses

For further information on:

Updates to this page

Published 1 December 2021
Last updated 18 December 2023 show all updates
  1. Updated 'Part B: generic design brief', 'Technical annex 1C: definitions of spaces', 'Technical annex 2B: external spaces', 'Technical annex 2C: external fabric', 'Technical annex 2D: internal elements and finishes', 'Technical annex 2G: electrical services, communications, fire and security systems', 'Technical annex 2H: energy', 'Technical annex 2J: sustainability' and 'Technical annex 3: fittings, furniture and equipment'.

  2. The following have been updated: 'Part B: Generic design brief', 'Technical Annex 2A: Sanitaryware', 'Technical Annex 2D: Internal elements and finishes', 'Technical Annex 2E: Daylight and electric lighting', 'Technical Annex 2F: Mechanical services and public health engineering', 'Technical Annex 2G: Electrical services, communications, fire and security systems', 'Technical Annex 2H: Energy', 'Technical Annex 2I: Controls', 'Technical Annex 2J: Sustainability' and 'Technical Annex 3: Fittings, furniture and equipment'.

  3. We added 'Employer's requirements Part A: General conditions' to a new page and added a link to it. We have also updated documents 'Part B: Generic design brief' and Technical Annexes 1A, 2B, 2D, 2G, 2H and 2J.

  4. Added 'Part A: General conditions'.

  5. First published.

Sign up for emails or print this page