tag:www.gov.uk,2005:/search/guidance-and-regulationGuidance and regulation2025-04-09T15:31:06+01:00HM Governmenttag:www.gov.uk,2005:/government/publications/hs2-phase-one-planning-forum-notes-for-local-authorities2025-04-09T15:31:06+01:00HS2 Phase One Planning Forum notes for local authoritiesThese notes have been developed through the Phase One Planning Forum for local authorities when considering Schedule 17 requests for approval.tag:www.gov.uk,2005:/government/publications/dvsa-earned-recognition-vehicle-operator-standards2025-03-31T10:00:01+01:00DVSA earned recognition: vehicle operator standardsThe standards that vehicle operators need to meet to join the Driver and Vehicle Standards Agency (DVSA) earned recognition scheme.tag:www.gov.uk,2005:/government/publications/hs2-route-wide-injunction-proceedings-20252025-03-12T09:43:41+00:00HS2 route-wide injunction proceedings (2025)Information regarding HS2 route-wide injunction proceedings.tag:www.gov.uk,2005:/government/publications/hs2-property-scheme-maps-by-constituency2024-11-07T15:43:27+00:00HS2 property scheme maps by constituencyThese maps show Westminster constituencies and highlight the HS2 route in those areas. Where relevant, they also indicate land that is safeguarded (both surface and sub surface) along with any HS2 Discretionary Property sche�tag:www.gov.uk,2005:/government/publications/hs2-phase-two-land-access-agreements2024-10-07T14:46:45+01:00HS2 Phase Two land access agreementsTemplates of land access agreements issued by HS2 in relation to environmental, ground investigation and sound and vibration surveys.tag:www.gov.uk,2005:/government/publications/a-guide-to-environmental-surveys-being-carried-out-by-hs22024-10-07T14:40:10+01:00A guide to environmental surveys being carried out by HS2For landowners and property occupiers, this guide explains the different types of environmental surveys and how long they take. tag:www.gov.uk,2005:/government/publications/hs2-guide-for-farmers-and-growers2024-10-07T14:37:55+01:00HS2 information for farmers and growersProvides information for farmers and growers affected by High Speed Two (HS2) construction.tag:www.gov.uk,2005:/government/publications/hs2-route-wide-injunction-proceedings-20242024-05-28T14:42:47+01:00HS2 route-wide injunction proceedings (2024)Information regarding HS2 route-wide injunction proceedings. These exhibits contain strong and/or abusive language and scenes of violence that some may find disturbing.tag:www.gov.uk,2005:/government/publications/hs2-design-case-studies2024-02-13T14:25:28+00:00HS2 Independent Design Panel: Case StudiesA series of case studies about the work of the HS2 Independent Design Panel.tag:www.gov.uk,2005:/government/publications/hs2-design-panel-newsletters2024-02-13T14:11:43+00:00HS2 Independent Design Panel newslettersA collection of newsletters, providing updates about the independent High Speed Two (HS2) Design Panel.tag:www.gov.uk,2005:/government/publications/hs2-safeguarding-for-developers-and-local-authorities2024-01-18T14:07:14+00:00HS2 safeguarding for developers and local authoritiesFor developers and local authorities who require further information on HS2 safeguarding.tag:www.gov.uk,2005:/government/publications/hs2-phase-2a-safeguarding-maps-handsacre-connection-to-the-west-coast-main-line2024-01-18T00:00:00+00:00HS2 former Phase 2a safeguarding maps: Handsacre connection to the West Coast Main LineMaps highlighting the HS2 former Phase 2a safeguarding area for the Handsacre connection to the West Coast Main Line.tag:www.gov.uk,2005:/government/publications/hs2-phase-2a-property-scheme-maps-handsacre-connection-to-west-coast-main-line2024-01-18T00:00:00+00:00HS2 former Phase 2a property scheme maps: Handsacre connection to West Coast Main LineMaps, broken down by area, show where the boundaries lie for the former Phase 2a property schemes, covering the Handsacre connection to the West Coast Main Line.tag:www.gov.uk,2005:/government/publications/hs2-route-wide-injunction-proceedings-20232023-12-22T15:59:21+00:00HS2 route-wide injunction proceedings (2023)Information regarding HS2 route-wide injunction proceedings. These exhibits contain strong and/or abusive language and scenes of violence that some may find disturbing.tag:www.gov.uk,2005:/government/publications/high-speed-rail-london-to-west-midlands-act-2017-schedule-17-statutory-guidance2023-11-20T11:34:25+00:00High Speed Rail (London to West Midlands) Act 2017: Schedule 17Information and guidance to all planning authorities that will determine a request for approval under Schedule 17 to the Act. tag:www.gov.uk,2005:/government/publications/hs2-phase-2a-high-speed-rail-west-midlands-to-crewe-act-2021-schedule-172023-11-20T11:34:21+00:00HS2 Phase 2a: High Speed Rail (West Midlands to Crewe) Act 2021 Schedule 17Information and guidance to all planning authorities that will determine a request for approval under Schedule 17 to the Act.tag:www.gov.uk,2005:/government/publications/hs2-phase-2a-planning-forum-notes-for-local-authorities2023-09-20T14:32:12+01:00HS2 Phase 2a Planning Forum notes for local authoritiesThese notes have been developed through the Phase 2a Planning Forum for local authorities when considering Schedule 17 requests for approval.tag:www.gov.uk,2005:/government/publications/where-to-view-the-hs2-phase-2b-crewe-manchester-additional-provision-2-and-supplementary-environmental-statement-22023-09-01T10:46:22+01:00Where to view the HS2 Phase 2b (Crewe � Manchester) Additional Provision 2 and Supplementary Environmental Statement 2These documents give details of where High Speed Rail (Crewe - Manchester) Additional Provision 2 and Supplementary Environmental Statement 2 documents have been deposited for inspection in the attached lists. tag:www.gov.uk,2005:/government/publications/hs2-phase-2b-plan-and-profile-maps-crewe-to-manchester-20222023-08-21T09:12:28+01:00HS2 Phase 2b plan and profile maps: Crewe to Manchester (2022)These plan and profile maps show the route between Crewe and Manchester as deposited in 2022.tag:www.gov.uk,2005:/government/publications/hs2-phase-2b-crewe-manchester-information-papers2023-07-21T11:40:06+01:00HS2 Phase 2b (Crewe � Manchester) Information PapersThese information papers have been produced to explain the commitments made in the High Speed Rail (Crewe � Manchester) Bill and the Environmental Minimum Requirements.