VCONST08960 - 鈥楢pproved alteration鈥� of a 鈥榩rotected building鈥� (changes introduced on 1 October 2012): terms 'relevant consent' and 'written contract

鈥楻elevant consent鈥�

For most buildings relevant consent means listed building consent. However many listed places of worship are exempt from the usual listed building controls under s60 of the Planning (Listed Buildings and Conservation Areas) Act 1990. For listed places of worship with this ecclesiastical exemption 鈥榬elevant consent鈥� means whatever consent for the approved alterations is required by the competent authority eg, for works on Church of England buildings, a 鈥榝aculty鈥�.

鈥榃ritten contract鈥�

The contract referred to in the transitional arrangements is the written contract with the builder, not the architects鈥� plans, planning permission etc.