What is DVSA earned recognition
The Driver and Vehicle Standards Agency (DVSA) earned recognition is a new way for vehicle operators to prove they meet driver and vehicle standards.
This means that they鈥檙e:
- continuously monitoring their own compliance
- using DVSA-validated IT systems
- compliant with road-safety standards
It鈥檚 a voluntary scheme for operators of all sizes.
How it works

IT systems
Operators need to have digital monitoring systems for vehicle maintenance and drivers鈥� hours. These check if they鈥檙e meeting a set of key performance indicators (KPIs).
Every 4 weeks, these systems tell DVSA if they鈥檝e missed any of the KPIs by a set amount. If this happens, DVSA will work with them to fix the issue.
DVSA will not have direct access to any of their data or systems.
Audit
Operators鈥� systems and processes must be audited by a DVSA-authorised audit provider:
- when their application to join the scheme has been reviewed
- every 2 years after that
DVSA will accept a successfully completed earned recognition audit either:
- up to 3 months before the operator applies
- 3 months after they鈥檝e submitted an application
If a concession鈥檚 been granted, they鈥檒l need an audit covering the appropriate section every year, up to April 2021.
Apply to become a validated IT systems provider
Eligibility
You鈥檒l need to meet the criteria outlined in the
document. And any system you鈥檙e providing will need to pass a validation process before it鈥檚 used by an earned recognition operator.The application process
To become a DVSA-validated IT systems provider, you鈥檒l first need to fill out the
and agree to the .The application form must:
- be completed in full
- include the system name
- state if it鈥檚 for maintenance or drivers鈥� hours
- give the contact details and name of the operator using the system
Any missing information will mean the application is delayed or rejected.
If you鈥檙e going to receive data from external sources, you need to:
- give details of those systems
- say whether they鈥檙e already validated for earned recognition
Maintenance-only system
If you鈥檙e supplying a maintenance-only system, it must be fully electronic. But, it can allow the input of manual records for up to 3 years from the date it goes live.
If the system is measuring manually-completed safety-inspections and driver-defect report documents, you must explain how:
- these are uploaded to your system
- the data is extracted to record the required KPIs
The application must:
- show that the system meets all the IT reporting needs
- include an example of the KPI reporting form
When applying, you must submit 3 periods of data from either:
- an existing earned recognition operator
- a new applicant
The data may be used for validation purposes.
If the scheme manager thinks that your application doesn鈥檛 meet the right standards, then the manager will reject it and contact you.
System validation
Data from your systems will be used to carry out the validation process, as well as data from either:
- an existing earned recognition operator, if they want to use your system
- a new applicant
If there鈥檚 not enough data to carry out a full validation, you may be asked to either:
- supply extra data
- go through an extra validation process
Maintenance
System validation will be carried out over at least 3 - but no more than - 13 measurement periods. A minimum of 150 safety inspection documents will be used.
When a suitable operator鈥檚 data has been identified:
- validation date ranges will be agreed
- the safety inspection documentation will be read to check:
- the registration number
- date of inspection
- all required fields are completed
- all defects have been rectified
- the vehicle has been signed off as being roadworthy
The frequency will be checked against the conditions of the operator鈥檚 licence. Another check will be made to confirm the number of defects raised during the validation period.
This data will be compared to the results from your system for the same time period. At this stage, the system alerts and triggers will be checked to confirm they鈥檙e recording properly.
If you pass the system validation process you鈥檒l be:
- accepted as a system provider
- allowed to report for earned-recognition operators
- published on the list of validated IT system suppliers
- allowed to use the earned recognition marque
If your system doesn鈥檛 meet the right standards, another full system validation will be necessary. Until that鈥檚 successfully completed, your system cannot be used for earned recognition purposes.
Re-validation will take place no longer than two years after the last full system validation.
Drivers鈥� hours
System validation will be carried out over at least 3 - but no more than 13 - measurement periods. It will use a minimum of 3000 tachograph records.
When a suitable operator鈥檚 been identified:
- validation dates ranges will be agreed
- tachograph raw data for both the driver and vehicle unit will be requested
This data will be analysed for:
- the four fixed-penalty bands
- overall infringements
- overall working time
Repeat offenders and most serious infringements will also be identified.
This data will be compared to the results from your system for the same time period. At this stage, the system alerts and triggers will be checked to confirm they鈥檙e recording properly.
If you pass the system validation process you鈥檒l be:
- accepted as a system provider
- allowed to report for earned-recognition operators
- published on the list of validated IT system suppliers
- allowed to use the earned recognition marque
If your system doesn鈥檛 meet the right standards, another full system validation will be necessary. Until that鈥檚 successfully completed, your system cannot be used for earned recognition purposes.
Revalidation will take place no longer than two years after the last full system validation.
Quality assurance
Random checks may be carried out on a validated system to make sure the data鈥檚 accurate. This will follow the same process but use a smaller sample.
If problems are found, the scheme manager will contact you to discuss the details. If the fault is system-related, you鈥檒l be given time to sort out the problem. If you do not do it, validation of your system may be removed.
What happens if you alter your system specification
In normal circumstances, you wouldn鈥檛 be expected to tell DVSA about system upgrades. But you would have to tell us if, as a result of the change, the system output had been affected.
You鈥檒l need to tell the scheme manager if changes made to your system would affect the reporting of KPIs. This could result in a full or partial system validation.
You鈥檒l also need to notify the scheme manager if you鈥檙e going to add a data source from a non-validated system. The reliability of this source will need to be checked before being accepted.
A new system or a major change to the existing system would mean it needs to be validated before being accepted. You may also have to complete a detailed application form.
Removing validated IT system provider status
The scheme manager may reject an application or remove your status as a validated IT system provider if:
- the validation process fails and changes aren鈥檛 made on time
- major changes are made to the system that affects the recording of results
- you fail to report when expected
- you鈥檙e involved in or linked to anything likely to damage the reputation of the DVSA earned recognition scheme
How to complain about being rejected or removed from validated IT system provider status
If your application or validated status is rejected or removed, you鈥檒l receive written notification from DVSA within 14 days detailing the reasons why.
You鈥檒l then have 14 days to respond in writing to the decision. Tell DVSA about anything you鈥檇 like them to take into account when reconsidering your status.
A DVSA corporate senior leader will look at it and decide whether: DVSA鈥檚 action has been proportionate and reasonable to uphold the decision of the scheme manager
If you鈥檙e not satisfied with the response you can email [email protected].
Updates to this page
-
Update to systems requirements document in the section "Scheme Rules". There is a change to the format for operator ID numbers and the email address used for KPI reporting.
-
Updated the terms and conditions that IT system providers need to agree to.
-
A new version of the application form has been added.
-
First published.