The financial breakdown in removing asbestos from Department for Education buildings

How much did it cost in total to remove asbestos from departmental buildings?

Documents

Details

  • Date requested: 24 August 2011
  • PublishDate: 13 September 2011
  • Updated: 02 November 2011

Request

Can the Department provide an annual financial breakdown from 2000 to 2010 in dealing with asbestos abatement (white, brown and blue asbestos) within its various estates around England?

Release

The costs below were incurred when removing insulation board and internal fire linings which contained a percentage of amosite (brown) and chrysotile (white) asbestos.

The work was required to facilitate the refurbishment of the physical office environment at the Department鈥檚 office聽in聽 Darlington. None of the other three properties in Runcorn, Sheffield and London incurred any costs associated with聽the removal of asbestos between 2000聽and 2010.

Based on statutory surveys undertaken during this period, and other information held on site, we believe these properties to be free of asbestos-containing material.

  • 拢24,721 (ex vat) was spent on asbestos abatement
  • 拢76,880 (ex vat) was spent on asbestos abatement