Research and analysis

Review of the Fire Transformation Fund projects: two years on, progress at April 2017 second edition

This report provides a review of the progress of projects two years after receiving Fire Transformation Fund (FTF) grant funding in April 2015.

Documents

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

The report covers; the proportion of the FTF spent at the two-year point, the issues or barriers and lessons learned for possible future funding schemes and a description of some completed projects in more detailed case studies.

As at the 24 month point, the total amount spent across all 37 projects was around 拢40.8 million, 10 projects had completed and the remaining incomplete projects had made varying levels of progress. In total, the projects anticipate saving 拢303.5 million across a ten year period.

Updates to this page

Published 5 July 2018
Last updated 6 July 2018 show all updates
  1. Following the publication of 鈥楻eview of the Fire Transformation Fund projects: two years on鈥�, a few typographical corrections have been identified in Appendix A for Staffordshire-2, Warwickshire and the Total. None of the figures, or findings, in the body of the report are affected. As a result, and in line with our published revisions policy, columns 鈥極riginal savings (拢)鈥� and 鈥楿pdated savings (拢)鈥� in Appendix have been updated with corrected figures for these three rows.

  2. Details text changed from 'the projects anticipate saving 拢90.6 million' to 'the projects anticipate saving 拢303.5 million'.