Off-route reports for High Speed Rail (Crewe � Manchester) Environmental Statement
These reports present the likely significant environmental effects of the construction and operation of HS2 Phase 2b Crewe � Manchester in areas not on the proposed line of route.
Documents
Details
These reports present the likely significant environmental effects of the construction and operation of HS2 Phase 2b Crewe � Manchester in areas not on the proposed line of route. ‘Volume 4� of the Environmental Statement summarises these effects. The accompanying technical appendices provide details of the studies and surveys undertaken.