Independent report

Hammersmith Bridge: engineering reports

Reviews by AECOM and the University of Cambridge's Professor Fleck of the modelling and analysis taken of Hammersmith Bridge by other engineering consultants.

Documents

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

In 2019, a detailed inspection of Hammersmith Bridge鈥檚 cast iron pedestals, which support the suspension chains, identified cracks in 3 of them, so it was closed to all motorised traffic and an acoustic monitoring system installed.

A case for continued safe operation (CCSO) was also prepared, which allowed the bridge to remain open to pedestrians, cyclists and river traffic beneath it.

During hot weather in August 2020, the monitoring system detected an 鈥榚vent鈥� so the bridge was closed to all traffic.

In September 2020, the Department for Transport (DfT) commissioned consultants AECOM to review the recent engineering studies of the bridge鈥檚 condition. AECOM conclude that our understanding of the bridge鈥檚 behaviour has improved considerably since the CCSO was written and recommend that it is revisited, alongside 15 other recommendations.

At the same time, the DfT commissioned Professor Norman Fleck of the University of Camridge 鈥� an expert in fracture mechanics 鈥� to review recent analysis and reports on the bridge, and comment on the condition of the pedestals.

Updates to this page

Published 10 December 2020

Sign up for emails or print this page