Decision

Cambridge re-signalling: Transport and Works Act order

Approval for Network Rail to renew the signalling system for the Cambridge area.

Documents

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

The order grants powers to Network Rail to enable the construction and operation of a scheme of re-signalling of the railway in the Cambridge area and to upgrade the level crossings at Croxton, Dullingham, Dimmock鈥檚 Cote, Milton Fen and Six Mile Bottom also within the Cambridge area. Consent to upgrade 2 further level crossings at Meldreth Road and Waterbeach has been refused.

Application details

This application is made under the .

  • order: The Network Rail (Cambridge re-signalling) Order

  • application status: decision issued

  • date of application: 5 August 2022

  • applicant: Network Rail via Addleshaw Goddard LLP

Updates to this page

Published 11 August 2022
Last updated 28 March 2024 show all updates
  1. Added decision letter and inspector鈥檚 report.

  2. First published.

Sign up for emails or print this page