Decision

CAC Outcome: GMB & Metallink Fluid Power Systems

Outcome(s) by the Central Arbitration Committee on an application from the GMB.

Documents

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

The decisions set out:

  • names of CAC panel members
  • name of the case manager
  • issue in dispute
  • views of the parties
  • considerations of the panel
  • final decision

Updates to this page

Published 14 December 2015
Last updated 5 April 2016 show all updates
  1. TUR1/947/15 GMB & Metallink Fluid Power Systems - Validity Decision issued.

  2. TUR1/947(2015) GMB & Metallink Fluid Power Systems - Bargaining Unit Decision issued

  3. TUR1/947(2015) GMB & Metallink Fluid Power Systems - Acceptance decision issued.

  4. First published.

Sign up for emails or print this page