Case study

Southend鈥檚 拢19.9 million infrastructure upgrades

Southend was allocated 拢19.9 million from the Levelling Up Fund to support local facilities and boost the tourism economy.

Renovation of Leigh Port

Plans for the funding will improve Leigh Port by:

  • resurfacing the wharf to make it safe for locals and visitors
  • dredging the area beside the quay wall and channel
  • constructing a quay wall frontage around the port
  • improving access to the site

Other infrastructure improvements in Southend

Other plans for the funding include:

  • investing in hospitality and visitor areas
  • refurbishing Cliffs Pavilion entertainment venues

Funding will also support essential maintenance and flood prevention measures across the:

  • wider seafront
  • Marine Parade
  • town centre

Find out more about .

Updates to this page

Published 17 January 2023