Field Safety Notices: 3 to 7 April 2023

List of Field Safety Notices (FSNs) from 3 to 7 April 2023.

Overview

If you receive a field safety notice (FSN) from a manufacturer you must always act on it.

MHRA publishes the following for information only.

If you have a question about a particular FSN contact the manufacturer.

Latest FSNs

View a

View . FSNs before this date are on the

Cordis: ANGIOGUARD鈩� RX/XP Emboli Capture Guidewire System

24 March 2023

Emboli Capture Guidewire System

MHRA reference:

Diagnostic Grifols: ERYTRA EFLEXIS

3 April 2023

Blood group/antibody screening analyser IVD automa

MHRA reference:

Elekta: Unity

March 2023

SINGLE ENERGY LINEAR ACCELERATORS

Model: 1553106

MHRA reference:

Medtronic: ACCY B31030 EXTENSION TUNNELER DBS

March 2023

Deep brain electrical stimulation system

Model: B31030

MHRA reference:

NuVasive: Precice System - IMLL, Short, Unyte and Freedom

April 2023

MHRA reference:

Updates to this page

Published 11 April 2023